Mining & Industrial Reliability Solutions · Zambia
Lusanga Technical Services · Zambia

Conveyor Systems

Lusanga conveyor project in Zambia
Flexco
Sole Distributor · Zambia

LTS + Flexco

Lusanga Technical Services is the sole distributor of Flexco heavy-duty mining conveyor products in Zambia. For more than 25 years, LTS has supported Zambia's conveyor industry with Flexco equipment, product selection, installation support, maintenance and field service.

Heavy-Duty Mining Range

Flexco solutions for demanding conveyor systems.

Our Flexco focus is the heavy-duty mining range used across open-pit, hard-rock and underground conveyor applications.

01 · Mechanical Belt Fastening

Heavy-duty belt fastening & repair

  • Bolt Solid Plate fasteners
  • Rivet Solid Plate fastening systems
  • Heavy-duty rip repair
  • Installation tools and maintenance equipment
02 · Belt Cleaning

Mine-duty primary & secondary cleaners

  • Mine-duty precleaners
  • Heavy-duty precleaners
  • Heavy-duty secondary cleaners
  • Plows and cleaner accessories
03 · Tracking & Training

Keep belts centred and structures protected

  • Heavy-duty belt trainers
  • Belt positioners and trackers
  • Solutions for wet, dry and high-load environments
04 · Load Zone Protection

Impact protection and material containment

  • DRX impact beds
  • Slider / impact beds
  • Skirting and load-zone containment
  • Transfer-point support
05 · Belt Maintenance Tools

Tools built around safe conveyor maintenance

  • Belt clamps
  • Belt cutters
  • Heavy-duty maintenance tools
  • Mine-site installation support
06 · LTS Field Support

Local installation, maintenance and conveyor support

  • Cold and mechanical splicing
  • Pulley lagging
  • Conveyor inspections and upgrades
  • Mine-site troubleshooting and field service

More than 25 years supporting Zambia's conveyor industry.

LTS combines Flexco's heavy-duty conveyor technology with local mining experience, product support and field execution across Zambia's Copperbelt and major mining operations.

LTS Flexco Case Study

Flexco Ceramic Pulley Re-Lagging — Kalumbila

LTS 034 was a 2,200 × 800 mm drive pulley re-lagged with 12 mm Flexlag pulley lagging for Kalumbila. The documented workflow covered receipt of the failed ceramic lagging, stripping, sandblasting, priming, re-lagging, inspection and preparation for return to site.

Drive Pulley2,200 × 800 mm12 mm FlexlagKalumbila
Failed ceramic pulley lagging before refurbishment
Before — worn / failed ceramic lagging
Pulley stripped and prepared for lagging
Preparation — stripped, sandblasted and primed
LTS team applying Flexco ceramic lagging
Application — Flexco ceramic lagging fitted by LTS
Completed Flexco ceramic lagged pulley
Finished — completed re-lagged pulley
Completed Flexco lagged pulley ready for dispatch
Dispatch — protected and ready for return to site
Close-up of failed ceramic lagging
Failure detail — missing ceramic tiles and exposed shell

Talk to LTS about Flexco

Let us provide the solution.

Send us the site, asset, product or operating problem and we will route it to the right Lusanga team.

Contact LTS